Projects completed

Milan Italy

ProtectiT was tasked with restoring the façade of a protected structure in Milan. ProtectiT partnered with a restoration company in Italy and managed all of these works to completion. This included plasters, balconies, railings and all stone works on the façade. The stone was then also sealed with ProtectiT specialised sealer.

Roscommon Plaza

ProtectiT Deep cleaned and sealed all of the newly paid paving in Roscommon Town including the plaza. This newly covered area was also treated before opening to the public.

Navan Anti-Graffiti

These walls were located all around a shopping area and also as upstands to planted areas. ProtectiT came in and removed all dirt grim and concrete residue before then applying ProtectiT Anti-Graffiti coating to all surfaces. This ensures easy Graffiti removal

Longford New paving

This was a newly paid area where the paving was grouted using high strength mortar. This can leave a residue of concrete on the surface which dulls the stone. Our team used ProtectiT deep cleaner and concrete remover to deep clean and remove all concrete residues. This area was then sealed with ProtectiT Public Realm Sealer.

Galway Steamers Quay

ProtectiT were asked to clean this dock area which is situated on the Corrib River. No chemicals could be used due to the proximity to water. Our team cleaned this area and removed as much vegetation as possible.

Ennis

ProtectiT were brought in to deep clean all of the newly laid paving in Ennis Town. We cleaned the whole area over 2 nights using our ProtectiT public Realm Cleaner which is specifically formulated to ensure no damage to the paving which had been sealed previously by our team with ProtectiT Public Realm Sealer.

Boyle Pleasure Grounds

The Pleasure Grounds is a facility in Boyle which is extensively used as a play area and it looked dirty and tired along with some graffiti hits on the stone. ProtectiT removed the graffiti with ProtectiT Graffiti Remover and then set about deep cleaning the whole area as well as all of the walled seating. Once this was completed we then used ProtectiT Public Realm sealer to protect the stone and allow for easier maintenance.

Boyle Street Cleaning

This was an area which had not been cleaned in some time. ProtectiT were tasked with deep cleaning the foot paths and bringing back the vibrant colour of the stone. Once this was completed we then sealed the paths with ProtectiT 100 public realm sealer to allow the paths to be cleaned easier in the future.

The Brown Door

The Brown door which is situated in the middle of Eyre Square in Galway city was highly infected with dirt, grim and algae growth. ProtectiT were tasked with cleaning the structure as best we could while at the same time being aware that the Brown Door is a protected structure.